The operation of the coarse grille machine needs to be checked

Jun 11,2022

1. Before the coarse grid machine: observe the filter near the leak hole, the left side is the rising filter, and there is a lot of garbage on the surface. On the right is the sliding filter, the surface should be clean and less slag.

2. After the coarse grid machine: observe the water flow of the water outlet on both sides of the rear of the grid. When the grille is running, the water rolls and the water flow is large. At the end, the water flow gradually decreases and the liquid level behind the grille becomes more and more stable.

3. Observe whether the grid machine runs for a cycle time and whether there is abnormal noise.

check often

1 Check if there is any dirt entanglement, if there is, remove it immediately;

2 Use a grease gun to inject calcium-based grease into the bearing seat once;

3. Check whether the operation of the entire equipment is balanced and there is no abnormal sound;

The grease in the reducer needs to be removed and replaced in time. All funds for general machinery and equipment are put into normal use. It needs to be degreasing and replaced after ten days of operation, and then degreasing and replacing every three months. Usually pay attention to the amount of reducer oil. The machine should be protected against prolonged "downtime". If the equipment is not invested immediately after installation, check the equipment for good condition at least once a week at a high speed of one hour.

weekly check

1) Check whether the equipment is running stably and whether there is any abnormal sound.

2) Check whether the electrical equipment route and emergency termination function of the equipment are all normal;

The rough grid machine should remain stable during the 72-hour trial operation; when the load is 405kg, everything can still run normally without deformation; the grid surface is flat without burrs, the bars are vertical, the layout is symmetrical, the relative deviation of the straight line does not exceed 4mm, and the grid The unevenness of the strips in the plane does not exceed 4mm/m.

While the rotary mechanical grill cleaner has to pay attention, it has to pay attention to a few things before cleaning it. Before the rotary mechanical grill cleaner rotates, the actual operator must check whether the equipment is abnormal when the power is off, and wet and maintain the rotary mechanical grill cleaner as required. Turn off the power, put the power switch in the "local" and "manual" positions, start the actual operation of the rotary mechanical grid cleaner, and observe the operation status of the grid cleaner, the status of slag removal, and whether there is any noise. or exception. If there is any abnormality, it should be terminated first, and handled and cleared according to regulations. After manual operation is normal, the rotary mechanical grill cleaner can be fully automatic for the actual operation. The operator continued to observe for ten minutes to observe the operation.

https://www.khnwatertreatment.com/

Send Inquiry

Contact Us

  • Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China
  • Tel:+86-510-87877760
  • Fax:+86-510-87877760
  • Ph:+8617751526380
  • E-mail:sales@khnwatertreatment.com

QR Code

Copyright © Wuxi Deiichen Machinery Pty.,Ltd. All Rights Reserved.