Tel:+86-510-87877760

Email: sales@khnwatertreatment.com

Home / Knowledge

Contact Us

Tel: +86 17751526380

Email: sales@khnwatertreatment.com

Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China

Knowledge

Production process of Coarse screen equipment

Apr 27,2023

The production process of Coarse screen equipment generally involves the following steps:

1. Design and Engineering: The first step involves the design and engineering of the Coarse screen equipment. This includes determining the specifications, size, and design features of the equipment.

2. Fabrication: The next step involves the fabrication of the equipment. The frame, mesh, and other components are manufactured according to the specifications and design.

3. Assembly: Once the components are fabricated, the Coarse screen equipment is assembled. This involves fitting the mesh onto the frame, connecting the supporting structure, and attaching the motor for operation.

4. Testing: After assembly, the equipment is subjected to testing to ensure that it meets the required specifications and operates as intended.

5. Quality Control: Quality control measures are taken throughout the production process to ensure that the equipment meets the required standards and specifications.

6. Distribution: Finally, the Coarse screen equipment is packaged and distributed to the clients or end-users.

Overall, the production process of Coarse screen equipment is thorough and involves several stages to ensure high-quality performance and reliability.

www.khnwatertreatment.com

Send Inquiry

Contact Us

  • Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China
  • Tel:+86-510-87877760
  • Fax:+86-510-87877760
  • Ph:+8617751526380
  • E-mail:sales@khnwatertreatment.com

QR Code

Copyright © Wuxi Deiichen Machinery Pty.,Ltd. All Rights Reserved.