Tel:+86-510-87877760

Email: sales@khnwatertreatment.com

Home / Knowledge

Contact Us

Tel: +86 17751526380

Email: sales@khnwatertreatment.com

Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China

Knowledge

Points for attention in the construction of small mechanical grilles

Jan 30,2022

1. Before construction, relevant technical personnel must conduct technical exchanges with construction workers. Let the other party know their application requirements clearly to avoid equipment failure.


2. During the construction process, the personnel involved in the operation must make specific records and do a good job in quality control. product quality.


3. Before operating the equipment, the corresponding accessories must be properly kept. Avoid loss or corrosion of accessories, affecting the construction process.


4. When installing the machine, it is necessary to remove the dirt, welding slag and other residues rich in the equipment.


5. During the construction process, the equipment construction method must be strictly implemented.


6. During the grouting process, remember to remove the dust and debris in the small mechanical grille in time. Also, before entering the water, the equipment must be placed after the appearance is wet. Avoid affecting the normal operation of the device.

https://www.khnwatertreatment.com/

Send Inquiry

Contact Us

  • Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China
  • Tel:+86-510-87877760
  • Fax:+86-510-87877760
  • Ph:+8617751526380
  • E-mail:sales@khnwatertreatment.com

QR Code

Copyright © Wuxi Deiichen Machinery Pty.,Ltd. All Rights Reserved.