Introduction to the installation of tubular aerator

May 18,2019

Before installing the tube aerator, the air line must be cleaned of all debris and the air line is clean; use air blown or rinsed with water to remove any debris and debris that may accumulate inside the tube end. Screw the tube aerator onto the prefabricated air wind adapter, taking care not to tighten too tightly. After the installation is completed, check whether the rubber film is damaged or not. The installation of the tube aerator is common. The rubber gasket and the connector are intact.

 

The layout of the tubular aerator façade is also required. The surface of the tube aerator is about 100 mm from the bottom of the pool, and the center of the air tube is about 50 mm from the bottom of the pool. The flow rate of the air duct is generally 10~1 for the main pipe and the vertical pipe; the branch pipe and the air pipe for the pipe are 4~5 m/s. The air distribution pipe is provided with a flange so that air can be used to blow off the debris in the pipe during commissioning and maintenance. An air distributor is also arranged at the end of the air distribution main pipe. The device utilizes compressed air to ensure uniform distribution of air volume in the aeration system and normal operation for a long time, thereby reducing the resistance and scaling possibility in the air distribution duct.

 

When the tubular aerator is installed, the intake pipe on the pool is leveled. According to the design requirements, the air distributor is at the bottom of the pool. The gas branch pipe can be raised or lowered arbitrarily within a certain range, so that the horizontal installation of the air distribution pipe can be ensured. It may not be difficult to install pipes on the ground floor of the uneven bottom. The air pipe in the pool should be made of stainless steel pipe or galvanized pipe, and the air branch pipe connected with the pipe aerator can be prefabricated in the factory and transported to the construction site.www.khnwatertreatment.com


Send Inquiry

Contact Us

  • Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China
  • Tel:+86-510-87877760
  • Fax:+86-510-87877760
  • Ph:+8617751526380
  • E-mail:sales@khnwatertreatment.com

QR Code

Copyright © Wuxi Deiichen Machinery Pty.,Ltd. All Rights Reserved.