Tel:+86-510-87877760

Email: sales@khnwatertreatment.com

Home / Knowledge

Contact Us

Tel: +86 17751526380

Email: sales@khnwatertreatment.com

Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China

Knowledge

How to adjust the packing installation of honeycomb inclined pipe

Nov 13,2019

How to adjust the packing installation of honeycomb inclined pipe

Honeycomb inclined pipe is a kind of packing for settling tank designed and developed on the basis of "shallow sedimentation" theory. The packing has large wet perimeter, good laminar flow state during operation, small hydraulic radius, no turbulence interference for particle sedimentation, which can accelerate the separation of particles from water and shorten the sedimentation distance of particles.

The packing installation of honeycomb inclined pipe also has certain skills, which can only be used normally after installation and debugging by professional installation personnel. How to debug? Here are some details:

(1) adjust the height and levelness of the outlet weir to a proper level to keep the outlet water uniform

(2) check whether the water inflow is uniform, without impact on the sedimentation tank and affecting the sedimentation effect;

(3) after the above construction procedures, the packing installation of inclined tube sedimentation tank has been completed. After normal operation, sludge discharge cycle shall be determined according to the concentration of suspended solids in the influent, and timely sludge discharge shall be paid attention to to to ensure that the inclined tube sedimentation tank always maintains good operation status and satisfactory effluent quality.


Send Inquiry

Contact Us

  • Add:No.26 Chuangye Road Heqiao Town Yixing City Jiangsu China
  • Tel:+86-510-87877760
  • Fax:+86-510-87877760
  • Ph:+8617751526380
  • E-mail:sales@khnwatertreatment.com

QR Code

Copyright © Wuxi Deiichen Machinery Pty.,Ltd. All Rights Reserved.